Every field has a history to tell
In the beginning, it’s the wildcat well
With little geological and offset data
It’s the exploration of the mysterious strata
Lift the derrick, set the rig
Attach the bit and start the dig
critical the operation; it would be
prevent the blowout by the BOP
Maintain the specific hydrostatic head
Balance the pressure of formation bed
Neither let the kick to cause
Check for any circulation loss
after drilling is successfully done
its time for the casing run
with casing collars and shoe at bottom
attach them hang them one by one
After reaching the TVD
fill the casings with slurry
above the slurry place the plug
for displacement use the heavy slug
Measure the absolute open flow
through isochronal and flow after flow
plot the vlp and IPR
find the operating point so far
after performing the dst
its time to replace the BOP
then without any further delay
install the Xmas tree
now its time for next tool run
commonly known as perforation gun
keep the mud weight high or low
for under or overbalance flow
replace the mud with heavy brine
place the plugs with wireline
isolate the oil potential zone
set the packers at depth known
run in hole the logging tool
with wireline wrapped around spool
lower the tool with certain pace
Interpret the signals at surface
lower the drawdown fulfill the need
controlled by the choke size indeed
BHP reduced oilflow starts
once oil was trapped now it is freed.
Poem on Petroleum Industry's operations.
By:
Ahmed Shakeel
Student of Petroleum Engineering
Student of Petroleum Engineering
NED University of Engineering and Technology, Karachi
0 comments: